Fossil Fuel Power Plant Maintenance
APComPower used a low-profile D-Head for tight 2G welds at Mt. Storm Power Station, achieving flawless inspection results.
APComPower used a low-profile D-Head for tight 2G welds at Mt. Storm Power Station, achieving flawless inspection results.
Contractor boosted winter welding productivity at Ravenswood Power Plant using Pipeliner II FCAW—14× faster than SMAW with minimal repairs.
Impressive X-ray–tested welds on 12” and 6” SCH80 pipes by K&M Mechanical using the Magnatech D-HEAD in Colorado.
10" schedule 40 stainless pipe welded with our Pipemaster 515 and D-Head 420,
BHEL needed high-quality welds in tight spaces for power plant tubing; adopted Magnatech D-Heads, now operating twelve systems.